Decorative striped banner
Kickoff

Cornell Six Sigma Hackathon 2026

On-campus: 24 hours · Virtual DL Challenge: 7 days
Tim Fraser
Tim Fraser, PhD
Assistant Teaching Professor, Systems Engineering
Cornell University
SYSEN 5300: Systems Engineering & Six Sigma
for Design and Operation of Reliable Systems
Learning Outcomes
Target with arrow in the bullseye
  • Scope
    • Pick one prompt; tell your agent
  • Design your data
    • Name the variables your user can log
  • Statistics first
    • Build and test one quality-control statistic
  • Ship
    • A working, reproducible tool on GitHub
Set up your computer
What you're doing tonight
1 Pick one prompt from your track
2 Design your data: you decide what gets logged
3 Ship a working quality-control tool
The statistics are the graded core.
A wide-awake night owl
Today's prompts
Live on Devpost at kickoff

six-sigma-hackathon.devpost.com

1 Open the Devpost page
2 Pick one prompt from your track (on-campus or DL)
3 Tell your agent its number and title
A crystal ball: the prompts are revealed at kickoff
Design your data
There is no dataset to download
  • Proxy variables are your inputs
  • Only what your user can actually measure
  • 2-3 invented test datasets in data/
  • data/README.md is the codebook: every variable, with units
A ruler: log only what your user can measure
What wins
A working tool

25

Does it run?

A gear
Valid quality-control analyses

25

Does it make sense, in R or Python?

A rising trend line
Design for a real user

25

One user, minimal inputs, a demo on test data

A dart in the bullseye
Documentation

25

Docs, test datasets, codebook, public repo

A stack of books
What wins
Correct statistics beat polish
One named user, one decision, minimal inputs
2-3 test datasets plus a codebook
Explain every number your tool prints
A small tool that runs beats a big one
Valid quality-control analysis is 25 points on its own.
A gold trophy
Scored 0-100 by event staff. Full rubric: docs/criteria.md in the hackathon repo.
The next 30 minutes
1Ask: Describe your app requirements and update the spec.md — or ask the agent to update the spec.md.
2 Run /plan with your agent
3 Statistic first: /build H-03, tested
4 Deploy early; style last
Read the plan as a team before you build.
A stopwatch
Help and handing in
No paid AI plan?

docs/opencode.md: OpenCode with a free Google AI Studio (Gemini) key. $0.

A key
Mentors

Bring sketches and specific questions, not a status update.

A speech bubble
Submit on Canvas

Your repo URL plus your Devpost project link.

An outbox tray
Deadlines

Live on the Canvas assignment, not on these slides.

A calendar

Questions?

A duck, ready to hear your question
Prompts: six-sigma-hackathon.devpost.com
Starter repo: github.com/timothyfraser/sixsigmahackathon
Pick your prompt in the first half hour. Start with the statistic.